A tool to extract Agile metrics and charts from JIRA projects and Trello Boards.

Installation

Requires Python 3.6 or later.

Install Python 3 and the pip package manager. Then run:

$ pip install jira-agile-metrics

You can do this globally, but you may want to use a virtual Python environment (venv) instead to keep things self-contained.

See The Hitchhiker's Guide to Python for the full details about how to install Python and venvs.

This should install a binary called jira-agile-metrics in the relevant bin directory. You can test it using:

$ jira-agile-metrics --help

... which should print a help message.

Using Docker

If you prefer, you can use Docker to install and run jira-agile-metrics with all the relevant dependencies in place. After installing Docker, run:

$ docker run -it --rm -v $PWD:/data optilude/jira-agile-metrics:latest config.yml

This will run jira-agile-metrics with the configuration file config.yml from the current directory, writing outputs also to the current directory. The argument -v $PWD:/data mounts the /data volume, where output files will be written, to the current working directory. You can of course specify a different bind mount.

Using Docker in batch mode

There is a second Docker image, which can be used to run multiple config files in batch mode, for example to generate metrics overnight.

To use it, create a directory containing one or more configuration files, with the extension .yml or .yaml, and a different directory for the outputs. Assuming these are /path/to/config and /path/to/output, you can run the following Docker command periodically, e.g. using cron or another scheduler:

$ docker run --rm -v /path/to/config:/config -v /path/to/output:/data optilude/jira-agile-metrics:batch-latest

When this is finished, you should see a directory under the output directory for each of the config files in the config directory, containing the reports and charts. You will also find a file called metrics.log containing the log output during the run, which may be helpful in diagnosing any problems.

Any command line arguments passed to docker run after the image name will be passed directly to jira-agile-metrics. So, for example, if you wanted to use the -n option to limit the number of results fetched from JIRA (for testing purposes), you can pass -n 10 (or some different number) at the end of the command line above.

Usage

The basic usage pattern is to run jira-agile-metrics with a configuration file, written in YAML format (see below), which describes:

The tool will then connect to JIRA or Trello using its web services API, run a query to the relevant tickets and their history, and calculate the required metrics.

The outputs are written to local filesystem files. Data files can be written in CSV, XLSX or JSON formats (depending on the extension of the desired output file), whilst charts are written as PNG images.

Server mode

jira-agile-metrics comes with a simple web server that can be used to produce metrics by uploading a configuration file and downloading a ZIP file with data and charts. To start it, run:

$ jira-agile-metrics --server 5000

This will start a server on port 5000 (you can also specify a bind host name or IP address, e.g. 0.0.0.0:5000). Visit this address in a web browser and upload a file.

In this mode, all other command line options are ignored.

Note: The web server is designed for low-volume usage only, and does not have a sophisticated security model. It is simply a more accessible front end to the features of the command line tool. The server will wait, synchronously, whilst JIRA is queried and charts are produced, which can take a long time. During this time, the browser will wait, and threads will block.

Warning: The web server does not encrypt requests, which means that by default JIRA/Trello credentials are transmitted in plain-text. You are strongly advised to configure a reverse proxy (e.g. nginx) with SSL enabled in front of it.

Using Docker to run the web server

There is a separate Docker image for running the web server, which uses nginx and uwsgi for improved performance and stability (but still not SSL, which would need to be configured with a domain-specific certificate):

$ docker run -d --rm -p 8080:80 --name jira_metrics optilude/jira-agile-metrics:server-latest

This will run the server in daemon mode and bind it to port 8080 on the local host. To stop it, run:

$ docker stop jira_metrics

See the Docker documentation for more details.

An important note about JIRA authentication

The tool uses a simple username/password combination to connect to JIRA. You need to ensure this user exists in the remote JIRA instance, and has the required permissions. A JIRA API token can be used in the place of a password.

There are three ways to provide the credentials for JIRA -- in particular, the password, which should be kept scret. You should think carefully about which approach makes most sense for you.

Example how to connect with username and API token:

# Connects with an API token that is passed on --password argument
jira-agile-metrics --username your-email@example.com --password CGI... config.yml

For Trello the tool uses a username plus an API Key/Token pair. You need to ensure this user exists in the remote Trello instance, and has the required permissions.

Example how to connect with username and API token:

# Connects with an API token that is passed on --password argument
jira-agile-metrics --username your-email@example.com --key 6d1658b... --token a7d6b34... config.yml

What issues should you include?

The most common use case is to calculate metrics for a team using a JIRA issue type called something like Story, going through a workflow with stages like Backlog, Committed, Elaboration, Build, Code review, Test, and Done, and allowing a set of resolutions like Completed, Withdrawn, and Duplicate.

jira-agile-metrics lets you use JIRA JQL syntax to specify which issues you are interested in. See the JIRA documentation for more details (or construct a search using the JIRA UI and then have JIRA show you the corresponding JQL).

Creating a configuration file - JIRA

Here is an example JIRA configuration file for a basic example using the workflow above:

# How to connect to JIRA. Can also include `Username` and `Password`
Connection:
    Domain: https://myjira.atlassian.net # your JIRA instance
    # bypass JIRA API call for the server version endpoint 
#   Jira server version check: False

# What issues to search for. Uses JQL syntax.
Query: Project=ABC AND IssueType=Story AND (Resolution IS NULL OR Resolution IN (Completed, Withdrawn))

# The workflow we want to analyse. By convention, the first stage should be
# the backlog / initial state, and the final stage should indicate the work
# is done.
#
# We map analytics names to JIRA status names. It's possible to collapse
# multiple JIRA statuses into a single workflow stage, as with `QA` below.
Workflow: 
    Backlog: Backlog
    Committed: Committed
    Elaboration: Elaboration
    Build: Build
    QA:
        - Code review
        - Test
    Done: Done

# What outputs to produce. These are all optional. If an option isn't set
# the relevant metric will not be produced.

Output:

    # CSV files with raw data for input to other tools or further analysis in a spreadsheet
    # If you use .json or .xlsx as the extension, you can get JSON data files or Excel
    # spreadsheets instead

    Cycle time data:
        - cycletime.csv
        - cycletime.json
    CFD data: cfd.csv
    Scatterplot data: scatterplot.csv
    Histogram data: histogram.csv
    Throughput data: throughput.csv
    Percentiles data: percentiles.csv

    # Various charts

    Scatterplot chart: scatterplot.png
    Scatterplot chart title: Cycle time scatter plot
    
    Histogram chart: histogram.png
    Histogram chart title: Cycle time histogram
    
    CFD chart: cfd.png
    CFD chart title: Cumulative Flow Diagram
    
    Throughput chart: throughput.png
    Throughput chart title: Throughput trend
    
    Burnup chart: burnup.png
    Burnup chart title: Burn-up

    Burnup forecast chart: burnup-forecast.png
    Burnup forecast chart title: Burn-up forecast
    Burnup forecast chart trials: 100 # number of Monte Carlo trials to run to estimate completion date

    # Burnup forecast chart throughput window: 60 # Days in the past to use for calculating historical throughput
    # Burnup forecast chart throughput window end: 2018-06-01 # Calculate throughput window to this date (defaults to today)
    # Burnup forecast chart target: 100 # items to complete in total; by default uses the current size of the backlog
    # Burnup forecast chart deadline: 2018-06-01 # deadline date, in ISO format; if not set, no deadline is drawn.
    # Burnup forecast chart deadline confidence: .85 # percentile to use to compare forecast to deadline
    
    WIP chart: wip.png
    WIP chart title: Work in Progress

    Ageing WIP chart: ageing-wip.png
    Ageing WIP chart title: Ageing WIP

    Net flow chart: net-flow.png
    Net flow chart title: Net flow

Hint: If you prefer to manage your queries as saved filters in JIRA, you can use the special JQL syntax of filter=123, where 123 is the filter ID.

If you save this file as e.g. config.yaml, you can run:

$ jira-agile-metrics config.yaml

This should prompt you for a username and password, and then connect to your JIRA instance, fetch the issues matching the query, calculate metrics, and write a number of CSV and PNG files to the current working directory (you can use the --output-directory option to write to another directory).

When testing configuration, it is often helpful to fetch just a small number of issues to speed things up. You can either do this by making your query more restrictive, or by using the -n flag to limit the number of issues fetched:

$ jira-agile-metrics -n 20 config.yaml

If you want more information about what's going on, use the -v flag:

$ jira-agile-metrics -v config.yaml

And if you are realy curious:

$ jira-agile-metrics -vv config.yaml

Creating a configuration file - Trello

If you are using Trello then your configuration file needs to look like this:

Connection:
    type: trello

# Board to get data from
Query: Web Services

Reusing elements of a config file

If you want to reuse some configuration elements (e.g., Connection, Workflow) across multiple configuration files, you can use the Extends option to "import" one file into another.

For example, if you had a file called common.yaml with:

Connection:
    Domain: https://myjira.atlassian.net

Workflow: 
    Backlog: Backlog
    Committed: Committed
    Elaboration: Elaboration
    Build: Build
    QA:
        - Code review
        - Test
    Done: Done

Output:

    Quantiles:
        - 0.5
        - 0.75
        - 0.95

Another file, e.g. team1.yaml, could then reuse these settings with:

Extends: common.yaml

Output:
    Cycle time data: team1-cycletime.csv
    CFD chart: team1-cfd.png
    CFD chart title: Team 1: CFD

The extended filename is resolved relative to the file being loaded, so in this example they would be in the same directory. You can use relative or absolute paths. Note that the path separator for relative paths is always / (forward slash), even on Windows!

When one file extends another, the extending file can override any options set in the extended file. So, for example, if team1.yaml also set Quantiles under Output, the list from common.yaml would be overridden in its entirety. This is the case for any option under Output, and for the Query / Queries and Workflow options in their entirety. Any Attributes will be merged.

You can use Extends recursively, i.e. an extended file can extend another file.

Note: The Extends feature is not available in server mode. If a file with an Extends line is uploaded to the server, an error will be thrown.

Available metrics

jira-agile-metrics can produce a number of data files and charts, which can be enabled in the Output section of the configuration file, or with a corresponding command line option.

Note: In the configuration file, you can specify output file names, but not absolute or relative paths. Files will always be written to the current working directory. This is to prevent unexpeced behaviour and the potential of overwriting other files when configuration files are moved around or used on a remote machine. No such restriction applies to output files specified in command line arguments.

Cycle time details

Details about each ticket and the date it entered each stage of the workflow. Both the CSV and JSON versions of this file can be used by the Actionable Agile Analytics tool, which offers powerful, interactive analysis of Agile flow.

In the configuration file:

Output:
    Cycle time data: cycletime.csv

You can also use .json or .xlsx formats. To output multiple files, use a list like:

Output:
    Cycle time data:
        - cycletime.json
        - cycletime.xlsx
        - cycletime.csv

Note: the "Blocked Days" calculation relies on the "Flagged" feature in JIRA, showing the total number of days (rounded up to the nearest whole day) that each ticket was flagged as impeded. Impediments raised whilst the ticket is in the backlog or done do not count.

Cumulative Flow Diagram (CFD)

Raw data for creating a valid Cumulative Flow Diagram, in spreadsheet format, and/or an image file of the same. The CFD shows the number of work items in each stage of the flow as a stacked area chart, day by day. This allows us to visualise WIP, cycle time, and throughput.

In the configuration file:

Output:
    CFD data: cfd.csv
    CFD chart: cfd.png
    CFD chart title: Cumulative Flow Diagram

You can also use .json or .xlsx formats for the data file. To output multiple files, use a list like:

Output:
    CFD data:
        - cfd.json
        - cfd.xlsx
        - cfd.csv

To only show the 30 most recent days in the chart:

    CFD window: 30

Cycle time scatter plot

Raw data for creating a valid Cycle Time scatter plot graph, and/or an image file of the same. This chart plots the end-to-end cycle time (excluding time spent in the backlog) for each work item against its completion date, and overlays quantiles (e.g. 85% of tickets took 18 days or fewer)

In the configuration file:

Output:
    Scatterplot data: scatterplot.csv
    Scatterplot chart: scatterplot.png
    Scatterplot chart title: Cycle time scatter plot

You can also use .json or .xlsx formats for the data file. To output multiple files, use a list like:

Output:
    Scatterplot data:
        - scatterplot.json
        - scatterplot.xlsx
        - scatterplot.csv

By default, the quantiles used are the 50th, 85th and 95th percentile, but you can specify a different list with the Quantiles option under Output:

    Quantiles:
        - 0.3
        - 0.5
        - 0.75
        - 0.85
        - 0.95

Note that this option affects all charts that use quantiles.

To get the quantile values (number of day at each quantile) in a data file, use:

    Percentiles data: percentiles.csv

To only show the 30 most recent days in the chart:

    Scatterplot window: 30

Cycle time histogram

This is a different view of the cycle time , calculatd and/or plotted as a histogram.

In the configuration file:

Output:
    Histogram data: histogram.csv
    Histogram chart: histogram.png
    Histogram chart title: Cycle time histogram

You can also use .json or .xlsx formats for the data file. To output multiple files, use a list like:

Output:
    Histogram data:
        - histogram.json
        - histogram.xlsx
        - histogram.csv

This also respects the Quantiles option (see above).

To only show the 30 most recent days in the chart:

    Histogram window: 30

Throughput

Weekly throughput, i.e. the number of items completed week by week. The chart also shows a trend line.

In the configuration file:

Output:
    Throughput data: throughput.csv
    Throughput chart: throughput.png
    Throughput chart title: Throughput trend

You can also use .json or .xlsx formats for the data file.

To change the frequency from weekly to something else, use:

    Throughput frequency: 1D

Here, 1D means daily. The default is 1W-MON, which means weekly starting on Mondays.

To only show the 6 most recent periods (e.g. weeks) in the chart:

    Throughput window: 6

WIP box plot

Shows a box plot of WIP, week by week (or some other frequency).

In the configuration file:

    WIP chart: wip.png
    WIP chart title: Work in Progress

To change the frequency from weekly to something else, use:

    WIP frequency: 1D

Here, 1D means daily. The default is 1W-MON, which means weekly starting on Mondays.

To only show the 6 most recent periods (e.g. weeks) in the chart:

    WIP window: 6

Net flow chart

Shows the difference between arrivals and departures week on week. In a perfectly stable system, the net flow would be 0.

In the configuration file:

    Net flow chart: net-flow.png
    Net flow chart title: Net flow

To change the frequency from weekly to something else, use:

    Net flow frequency: 1D

Here, 1D means daily. The default is 1W-MON, which means weekly starting on Mondays.

To only show the 6 most recent periods (e.g. weeks) in the chart:

    Net flow window: 6

Ageing WIP chart

Shows the cycle time to date for each work item, grouped into the stages of the workflow. This can help identify slow-moving tickets.

In the configuration file:

    Ageing WIP chart: ageing-wip.png
    Ageing WIP chart title: Ageing WIP

Burn-up chart

A basic Agile burn-up chart, based on a count of items completed and in the backlog.

In the configuration file:

    Burnup chart: burnup.png
    Burnup chart title: Burn-up

To only show the 30 most recent days in the chart:

    Burnup window: 30

Burn-up chart with forecast line

A more advanced version of the burn-up chart, which will run a Monte Carlo simulation based on historical throughput to forecast a completion date for the scope.

The simulation can be calibrated with a series of options to set:

In the configuration file:

    Burnup forecast chart: burnup-forecast.png
    Burnup forecast chart title: Burn-up forecast
    Burnup forecast chart trials: 100 # number of Monte Carlo trials to run to estimate completion date

    Burnup forecast chart throughput window: 60 # Days in the past to use for calculating historical throughput
    Burnup forecast chart throughput window end: 2018-06-01 # Calculate throughput window to this date (defaults to last day of burnup)
    Burnup forecast chart target: 100 # items to complete in total; by default uses the current size of the backlog
    Burnup forecast chart deadline: 2018-06-01 # deadline date, in ISO format; if not set, no deadline is drawn.
    Burnup forecast chart deadline confidence: .85 # percentile to use to compare forecast to deadline

To only show the 30 most recent days in the chart:

    Burnup forecast window: 30

Impediments

Note this feature is not available in Trello.

If you use the "Flagged" feature in JIRA to mark (and unmark) tickets as impeded when they are blocked, you can produce charts showing the number of impediments raised, and the cumulative amount of time tickets have spent being impeded, broken down by month and either the flag set or the the workflow stage a ticket was in when the flag was set. You can also write out the impediment events to a file.

The charts can be enabled with:

Impediments data: impediments.csv
Impediments window: 6
Impediments chart: impediments.png
Impediments chart title: Number of impediments
Impediments days chart: impediments-days.png
Impediments days chart title: Total impeded days
Impediments status chart: impediments-status.png
Impediments status chart title: Number of impediments by status
Impediments status days chart: impediments-status-days.png
Impediments status days chart title: Total impeded days by status

Note that by default, only a single value ("Impediment") is available for the Flagged field in JIRA, and indeed only one field can be set when using the "Set flag" option on a JIRA Agile board. However, you can enable additional values in the field configuration for the relevant field, and make that field available on the issue edit screen.

The Impediments window, which is optional, can be used to limit the chart to showing only the most recent months' data: six in this case.

The Impediments chart and Impediments status chart will count the number of impediment events that were active each month, i.e. a ticket was flagged as impeded at some point during the month.

The Impediments days chart and Impediments status days chart uses the same underlying logic, but instead of counting impediments, it sums the number of days of all impediments in each month.

Note that:

Defect density

Three charts for analysing the amount of defects that have been open historically, grouped in various ways into stacked bar graphs.

These charts all rely on a separate JIRA query:

Defects query: issueType = Bug

Again, you can use the filter=123 JQL syntax to delegate the query specifics to a named filtered.

The three available groupings are:

They each require you to specify the name of the relevant field, and a chart output. You can also optionally specify a list of allowed values for each field, which lets you control the order. Finally, you can specify a "window" of how many of the most recent months to show (the default is to show all months for which there is data). Here is an example that enables all charts, and limits to showing the six most recent months in each:

Defects query: issueType = Bug
Defects window: 6
Defects priority field: Priority
Defects priority values:
    - Low
    - Medium
    - High
Defects type field: Root cause
Defects type values:
    - Config
    - Data
    - Code
Defects environment field: Environment
Defects environment values:
    - SIT
    - UAT
    - PROD

Defects by priority chart: defects-by-priority.png
Defects by priority chart title: Defects by priority
Defects by type chart: defects-by-type.png
Defects by type chart title: Defects by type
Defects by environment chart: defects-by-environment.png
Defects by environment chart title: Defects by environment

If you omit any of the chart names, the relevant chart will not be produced. If you omit any of the field names, the relevant chart will not be stacked. If you omit the values list, all unique values will be shown.

Defects in Trello

As Trello does not have different issue types you need to use a different way of identifying failure demand. The tool allows you to map a Trello label to an issue type:

Type Mapping:
    Defect:
        - bug

This allows you to analyse failure demand separately from value demand in ActionableAgile:

Technical debt

Two charts that show the nature and age of recorded (unresolved) technical debt.

These require a separate JIRA query. You should also identify the field indicating priority:

Debt query: issueType = "Tech debt"
Debt priority field: Priority
Debt priority values:
    - Low
    - Medium
    - High

As ever, use filter=123 to use a named filter instead. If you omit the Debt priority values option, all unique priority values will be used, in alphabetical order.

The first chart shows the open technical debt items each month as a stacked bar chart grouped by priority. You can optionally specify a "window" to show only a limited number of the most recent months:

Debt window: 3
Debt chart: tech-debt.png
Debt chart title: Technical debt

The second chart shows the number of open technical debt items by their current age in days, broken down by priority, and stacked into "bins":

Debt age chart: tech-debt-age.png
Debt age chart title: Technical debt age
Debt age chart bins:
    - 30
    - 60
    - 90

This will use the age brackets 0-30 days, 31-60 days, 61-90 days, and over 90 days (which also happens to be the default).

Waste (withdrawn items)

This chart shows how many work items are withdrawn or cancelled after work has started. It relies on a separate JIRA query, and assumes that withdrawn work items are all "resolved" in JIRA. Moreover, it assumes that these work items follow the same workflow as that used for the other charts and files, i.e. as mapped in the Workflow section of the configuration file.

Here is an example:

Waste query: issueType = Story AND resolution IN (Withdrawn, Invalid)
Waste window: 10
Waste frequency: 2W-WED
Waste chart: waste.png
Waste chart title: Waste

This will show withdrawn items broken down by the period in which they were withdrawn for the the 10 most recent periods. The default period length is monthlyasfd, but here we have set it to 2W-WED, which means a two-week period starting on a Wednesday. Waste window and Waste frequency are both optional.

Progress report

An status report that uses Monte Carlo simulation forecasting at the epic level.

The report is presented as a self-contained HTML file with embedded images. It relies on a small number of commonly used, externally hosted libraries (the Bootstrap CSS/JS library and its jQuery dependency; the Fontawesome icon font), but can be served from any static web server or opened as a local file on any modern web browser. It should also print reasonably well, although the embedded images showing context-specific Cumulative Flow Diagrams and Cycle Time Scatter Plots are only accessible by clicking on the relevant icons in a browser.

The status report is based on the principle of outcomes (e.g. projects, releases, objectives) that are broken down into epics, which will eventually be further broken down into stories. Epics are assumed to be fully owned by exactly one team. Epics and stories are represented by JIRA tickets discoverable by JQL queries specified in the configuration file, whereas outcomes and teams are enumerated in the configuration file directly.

A forecast to complete is then produced for each epic by calculating:

This is done many times over in a Monte Carlo simulation, to identify a range of plausible completion dates. If a deadline is set on an epic, the forecast to complete will be compared with it, to highlight the likelihood of hitting the deadline. (Deadlines may also be set at the outcome-level, in which case the outcome deadline is the default for all epics.)

The simulation takes into account that a single team may have multiple epics to complete. A team can be configured to have an epic WIP limit of 1 (the default) or more. If the team is working on more than one epic at a time, it is assumed to distribute its throughout roughly evenly across all active epics, and to work through the epics in the order in which their respective outcomes are listed in the configuration file, and then in the order in which they are returned by the query used to find them.

Here is a complete example configuration file that produces a report akin to the screenshot above:

Connection:
    # not shown

# ...

# Used for calculating progress against an epic, and team throughput: to
# identify whether stories are in the backlog, in progress, or completed.
Workflow:
    Backlog: Backlog
    Committed: Next
    Build: Build
    Test:
        - Code review
        - QA
    Done: Done

Output:
    # Used to determine which percentiles to show in the forecast
    Quantiles:
        - 0.75
        - 0.85
        - 0.95

    # The name of the file to write. If not set, the progress report will
    # not be produced
    Progress report: progress.html

    # Report title
    Progress report title: Acme Corp Websites

    # Names of JIRA fields on epics, used to determine the deadline, team,
    # and min/max stories. All are optional:

    # - if no deadline field is set, the report will not include any
    #   deadline calculations
    Progress report epic deadline field: Due date

    # - if no team field is set, you must specify exactly one team under
    #   `Progress report teams`, which will be used for all epics
    Progress report epic team field: Team

    # - if no min stories field is set, the story count will be based solely
    #   on the number of stories raised against each epic, rather than an
    #   estimated range; if no max stories field is set, the min stories
    #   field will be used to identify an absolute value
    Progress report epic min stories field: Min stories
    Progress report epic max stories field: Max stories

    # The query used to identify epics for each outcome. The special
    # placeholder `{outcome}` will be replaced by the outcome key (or name,
    # if the key is not set). May be overridden by the `Epic query` set on
    # an individual outcome. If not set, the `Epic query` must be specified
    # on each outcome, and it is not possible to use outcomes as tickets.
    Progress report epic query template: project = ABC AND type = Epic AND Outcome = {outcome} ORDER BY created

    # The query used to identify stories for an epic. The placeholders
    # `{epic}`, `{outcome}`, and `{team}` may be used to parameterise the
    # query.
    Progress report story query template: project = ABC AND type = Story AND "Epic link" = {epic}

    # A list of teams. At least one team is required, and each team must
    # have a `Name` and *either* `Min throughput` and `Max throughput`
    # (stories per week), *or* a query in `Throughput samples`. `WIP`
    # (number of epics the team may work on in parallel) and
    # `Throughput samples window` (number of weeks in the past from which to
    # draw samples) are optional. The placeholder `{team}` can be used to
    # reference the team name in the samples query.
    Progress report teams:
        - Name: Red
          Min throughput: 5
          Max throughput: 10
        - Name: Blue
          WIP: 2
          Throughput samples: project = ABC AND type = Story AND Team = {team}
          Throughput samples window: 6

    # A list of outcomes. May be omitted, in which case epics will not be
    # grouped into outcomes and the `Progress report epic query template`
    # specifies a non-parameterised query for all relevant epics. If
    # included, each outcome must have a `Name`. `Key`, which is used in
    # the epic query template, is optional, defaulting to the same value as
    # `Name`. `Deadline` can be used to specify a deadline for all epics
    # in the report, which can be overridden on a per-epic basis.
    # `Epic query` may be used to specify a particular query for
    # epics, overriding the more general `Progress report epic query template`.
    Progress report outcomes:
        - Name: MVP
          Key: O1
          Deadline: 2019-01-01
        - Name: Asia launch
          Key: O2
        - Name: Europe revamp
          Key: O3
          Epic query: project = ABC and type = Feature

In this example, we have listed the outcomes explicitly in the configuration file. It is also possible for the outcomes to be managed as JIRA ticket (or even to mix the two approaches). To do this, you need to specify a query for finding the outcomes:

    Progress report outcome query: project = ABC AND type = Outcome AND resolution IS EMPTY ORDER BY summary

    # Optionally give a field name for the outcome-level deadline, which
    # will be used as a fallback if epic-level deadlines are not set
    Progress report outcome deadline field: Due date

If using tickets to specify outcomes, Progress report epic query template must be set. The {outcome} placeholder will be replaced by the relevant outcome ticket key. You can thus use a linked issue field to specify the outcome.

In a simpler use case, you can model a single team performing all work, and/or dispense with the "outcome" level entirely, modelling only epics. The estimated min/max story count and the entire concept of deadlines are also optional.

Here is a minimal example:

# ...

Workflow:
    Backlog: Backlog
    Committed: Next
    Build: Build
    Test:
        - Code review
        - QA
    Done: Done

Output:

    Quantiles:
        - 0.75
        - 0.85
        - 0.95

    Progress report: progress-minimal.html
    Progress report title: Acme Corp Websites
    Progress report epic min stories field: Story count
    Progress report epic query template: project = ABC AND type = Epic AND resolution IS EMPTY ORDER BY created
    Progress report story query template: project = ABC AND type = Story AND "Epic link" = {epic}
    Progress report teams:
        - Name: Default
          Min throughput: 5
          Max throughput: 10

You can also turn off forecasts for some or all teams, if you don't have confidence in the predictability of team pace or in the underlying data quality. You will still get the progress bars and charts. In this case, you can either omit the Min throughput / Max throughput fields for a specific team, or omit the Progress report teams section in its entirety. Team names will be taken from the relevant field on epics (presuming an epic team field name is specified):

# ...

Workflow:
    Backlog: Backlog
    Committed: Next
    Build: Build
    Test:
        - Code review
        - QA
    Done: Done

Output:

    Quantiles:
        - 0.75
        - 0.85
        - 0.95

    Progress report: progress-teams.html
    Progress report title: Acme Corp Websites
    Progress report epic min stories field: Story count
    Progress report epic query template: project = ABC AND type = Epic AND resolution IS EMPTY ORDER BY created
    Progress report story query template: project = ABC AND type = Story AND "Epic link" = {epic}
    Progress report epic team field: Team

Technically you can omit both the teams list (so no forecasts) and the team field name, in which case you just get a breakdown of the epics with no forecasting or grouping.

Also note that if you do specify a list of teams and an epic team field, the list of teams will be automatically extended with any team names found that are not explicitly listed in the configuration.

More details about the configuration file format

The configuration file is written in YAML format. If you are unfamiliar with YAML, know that:

The sections for Workflow is required. Additionally, you must either specfiy a single Query, or a block of Queries (see below). Connection details must be set either in the Connection file or as command line arguments.

Under Workflow, at least two steps are required. Specify the steps in order. You may either specify a single workflow value or a list (as shown for QA above), in which case multiple JIRA statuses will be collapsed into a single state for analytics purposes.

The file, and values for things like workflow statuses and attributes, are case insensitive.

Extracting additional attributes

You may want to add additional fields to the cycle time output data. Use an Attributes block to do this:

Attributes:
    Priority: Priority
    Release: Fix version/s
    Team: Team name

Here, three additional columns will be added: Priority, Release and Team, corresponding to the JIRA fields Priority, Fix version/s and Team name, respectively.

When specifying attributes, use the name of the field (as rendered on screen in JIRA), not its id (as you might do in JQL), so e.g. use Component/s not components.

The attributes Type (issue type), Status and Resolution are always included.

Multi-valued fields

Some fields in JIRA can contain multiple values, e.g. fixVersion. By default, the extractor will use the first value in such a field if one is specified in the Attributes block. However, you may want to extract only specific values.

To do so, add a block like the following::

Attributes:
    Release: Fix version/s

Known values:
    Release:
        - "R01"
        - "R02"
        - "R03"

The extractor will pick the first "known value" found for the field. If none of the known values match, the cell will be empty.

Combining multiple queries

If it is difficult to construct a single set of criteria that returns all required issues, multiple queries can be added into a Queries block, like so:

Queries:
    Attribute: Team
    Criteria:
        - Value: Team 1
          JQL: (filter=123)

        - Value: Team 2
          JQL: (filter=124)

In this example, two queries will be run, based on the two filters 123 and 124 (you can use any valid JQL).

In the cycle time output, a new column called Team will be added, as specified by the Attribute field under Queries. For all items returned by the first query, the value will be Team 1 as per the Value field, and for all items returned by the second query, it will be Team 2.

Troubleshooting

Output settings reference

The following options can be set in the Output: section of the configuration file.

General options

These options affect multiple charts and files.

Data files

These options name data files to write. Use an extension of .csv, .xlsx, or .json according to the required file format. May be specified as either a list of filenames, or a single filename.

Scatterplot chart

Histogram chart

Cumulative Flow Diagram

Throughput chart

Burnup chart

Burnup forecast chart

WIP chart

Ageing WIP chart

Net flow chart

Impediments chart

Defect density charts

Debt density chart

Waste chart

Progress report

Changelog

0.25

0.24

0.23

0.22

0.21

0.20

0.19

0.18

0.17

0.16

0.15

0.14

0.13

0.12

0.11

0.10

0.9

0.8

0.7

0.6

0.5

0.4

0.3

0.2

0.1